Student Accommodation
Purpose Built Student Accommodation (PBSA)
Purpose Built Student Accommodation (PBSA)
Client:
Vita Student Group
Vita Student Group
Location:
Lewisham
Lewisham
Lewisham Exchange is a modern development contributing to the regeneration and revival of Lewisham town centre. Consisting of student rooms and affordable homes, this development is a reflection of Lewisham’s diverse community. The project provides 758 student accommodation beds in two towers of 36 and 20 storeys with ground floor amenity and commercial uses.
The development includes a range of MMC solutions with a Pre-Manufactured Value of 63% driving a 20-month programme which is 40-50% faster than traditional building. The building comprises 1,215 modules with the first module installed in September 2020 and the final module in February 2021.
The development includes a range of MMC solutions with a Pre-Manufactured Value of 63% driving a 20-month programme which is 40-50% faster than traditional building. The building comprises 1,215 modules with the first module installed in September 2020 and the final module in February 2021.
Pre-Manufactured Value (PMV) Estimator
Low
Medium
High
MMC Category
1
Pre-manufacturing
(3D primary structural systems)
2
Pre-manufacturing
(2D primary structural systems)
3
Pre-manufacturing components
(Non-systemised primary structure)
4
Additive Manufacturing
(Structural and non-structural)
5
Pre-manufacturing
(Non-structural assemblies
& sub-assemblies)
6
Traditional building product led site labour reduction / productivity improvements
7
Site process led site labour reduction / productivity / assurance improvments